Our
project experience includes the following:
-
Topographic Survey Phase-3,
Package 1B Banda Aceh Zone 6 & 7 – Banda Aceh – NAD.;
GPS Survey, Control Point Survey, Cross & Longitudinal Section,
Topographic Mapping.; Client/Owner : BRR - Sea Defence Consultants Aceh
& Nias.; 2007
-
Hydro
Oceanographic Survey for Under Sea Cable Line – Kawasan 3 Nusa –
Bali. ; GPS Survey, Coastal Topographic Mapping, Bathymetric
Survey, Tidal Observation, Sub Bottom Profiling, Side Scan Sonar, Seabed
Sampling, Marine Magnetometer Survey, Current Measurement; Client/Owner
: PT. PLN (Persero) JASA ENJINIRING.; 2007
-
Hydrographic
Survey to support the Detailed Design Stage – Navigation Channel Port
- Madura Strait - East Java. ; Control Survey, Coastal
Topographic, Bathymetric Survey, Sediment and Bottom Sampling; Client /
Owner : ALMEC Corporation & JICA Study Team (Japan)
-
Hydrographic
Survey to support the Detailed Design Stage – Special Port Penajam -
East Kalimantan. ; Control Survey, Coastal Topographic,
Bathymetric Survey; Client / Owner : Bappeda Penajam.
-
Topographic
Survey Services to support the development of Airport Infrastructure
Design. ; Cut Nyak Dien Airport – Meulaboh 2007, Sultan
Iskandar Muda Airport – Banda Aceh 2006, Syekh Hamzah Fansyuri Airport
– Singkil, 2006, Fatmawati Airport – Bengkulu 2007, Sultan Mahmud
Badaruddin II Airport – Palembang 2007, Stagen Airport – Kotabaru
2007, Sepinggan Airport – Balikpapan 2007, Teuku Cut Ali Airport -
Tapaktuan 2006, Hasanuddin International Airport – Makassar 2003 –
2004; Client/ Owner : Dinas Perhubungan Udara.
-
Topographic
Survey Services to support the development of Airport Master Plan
Design. ; West Java International Airport – Majalengka
2005, Lombok International Airport – Praya 2006; Kualanamu
International Airport – Medan 2007, Cleint / Owner : Bappeda &
Angkasa Pura.
-
Topographic
Survey for Gold Mine Gunung Mas and Batu Api Prospect Project –
Central Kalimantan (400 HA). ; Topographic Survey Mapping and
Longitudinal Sectional Survey; Client/Owner: PT. TransAsia Resources
(Russian).
-
Transmission
Line Survey – Batulicin-Barikin/Kandangan – South Kalimantan (120
KM).; GPS / Control Point Survey, Alignment Survey, Cross
& Longitudinal Section Survey, Topographic Mapping, Staking Out
Survey, Pegging.; Client/Owner : PT. PLN (Persero) Pikitring Kalimantan.;
2006/2007
-
Transmission
Line Survey – PLTU Banjar Sari GI
Lahat – South Sumatera (24 KM) .; Control Point Survey,
Alignment Survey, Cross & Longitudinal Section Survey, Topographic
Mapping, Staking Out Survey, Pegging.; Client/Owner : PT. Bukit
Pembangkit Innovative .; 2007
-
Port
of Bayah Feasibility Study – Pelabuhan Ratu – West Java.;Bathymetric
Survey, Tidal Observation, Geophysical Investigation: Sub Bottom
Profiling, Coastal Topographic Mapping, Access Road Topographic Mapping,
Onshore & Offshore Soil Investigation,. ;Client/Owner : PT. BORAL
INDONESIA.; 2006
-
Site
Investigation for Tanjung Jati A Coal Fired Steam Power Plant –
Cirebon – West Java Province.; Control Point Survey,
Topographic Mapping, Bathymetric Survey, Tidal Observation.;
Client/Owner : PT. Tanjung Jati Power Company.; 2005/2006.
-
The
Detailed Design Study on The Urgent Rehabilitation Project of The
Tanjung Priok Port in The Republik of Indonesia – Jakarta.;
GPS Survey, Control Point Survey, Cross & Longitudinal Section,
Topographic Mapping, Port shape break water monitoring; Client/Owner :
JICA Study Team.; 2005
-
Geodetic
Survey Services for Pantai Indah Kapuk – Tangerang &
Jakarta.; Geodetic GPS Control Point Survey, Topographic Mapping,
Bathymetric Survey, Tidal Observation, Current Measurement, Water
Temperature & Salinity; Client/Owner : PT. PANTAI INDAH KAPUK &
PT. Mandara Perkasa; 1997/2002/2003/2004.
-
Marine
Geophysical Survey & Soil Investigation Bojonegara Port Development
Project – Bojonegara – Banten Prov.;
GPS Control Survey, Tidal Measurement, Bathymetric Survey and
Geophysical Investigation: Sub-bottom Profiling Survey and Offshore Soil
Investigation.; Client: KISOJIBAN Co.Ltd, (Japan) in association witj
PT. Pondasi Kisocon Raya.; 2002/2003
-
Bajulmati
Dam Consulting Services for PTSL II – Banyuwangi – East Java Prov.;
GPS Survey, Control Point Survey, Topographic Mapping, Cross
& Longitudinal Section Survey, Staking Out Survey; Client/Owner:
PTSL II – Nippon Koei Co.Ltd,; 2002
-
INCO
Geodetic Survey Services – Soroako – South Sulawesi;
Control Point Survey, Topographic Mapping, Cross Section Survey,
Staking Out Survey and Positioning Settlement Monitoring of Dam;
Client/Owner : PT.Inco.;
2001/2002
-
Hemoco
Selayar Oil Refenery International Project - Selayar Island - South
Sulawesi; Tidal Obervation, Current Observation, Bathymetric
Survey, Wave Observation; Client/Owner: Hemoco Selayar
International Oil Refinery; 1999.
-
Pipe-lay
River Crossing Project - Peciko (Tunu Field) - East Kalimantan;
Positioning Navigation & Survey Checking of pipe-laying, Bathymetric
survey; Client/Owner: Geocean Solmarine - Total Indonesia; 1998.
-
Baron
Wave Electric Power Plant - Jogyakarta Prov.; Topographic
survey & mapping (1:500), Oceanographic Survey, Tidal Observation,
Bathymetric Survey, Wave Observation, Current Observation, Hydro-dynamic
Modeling; Client/Owner: Indonor A/S Norway & BPPT Indonesia;
1997/998.
-
Modeling
and Measurement of Effluent Discharge Plumes in Java Sea - Pabelokan;
Dispersion Characteristic Study, Water Digital Model, Water Quality
Test; Drogue Tracking, Digital Tidal Atlas; Client/Owner: Maxus -
Southeast Sumatera Inc.; 1997/1998.
-
Tuban
Marine Facilities – East Java Province.;
Hydrographic Survey : Current Measurement, tidal Observation,
Water Temperature & Salinity, Navigation Positioning, Droque
Tracking, Water Sample. Client/Owner: High Point Rendel, PT.Transpacific
Petrochemical Indotama; 1996.
-
Bali
Turtle Island Development Project - Turtle/Serangan Island - Bali;
GPS Survey for horiz. control establishment, Leveling Survey,
Topographic survey & mapping (1:1000 & 1:500); Topographic
Survey and Mapping using DGPS (1:2000), Longitudinal &
cross-section, Survey Tidal Observation, Bathymetric Survey, Post
Dredging Survey; Hydro-dynamic Modeling; Client/Owner: Penta Ocean Co.
Ltd.; 1996.
-
Karawang
Industrial Estate Project - West Java; 3 Dimension Digitizing
of Topographic Mapping; Client/Owner: PT Pembangunan Delta Mas & PT
Pura Delta Lestari; 1995.
-
Feasibility
Study for Lower Larona Hydro Power Plant Project - South Sulawesi;
Topographic Survey & Mapping (1:1000), River Cross/Long Section,
Control Survey; Client/Owner: PT INCO Indonesia; 1995.
-
Feasibility
Study For Indonesian First Nuclear Power Plant (STEP III) - Muria -
Central Java; Tidal Observation, Wave Observation, Current
Measurement, Bathymetric Survey, Magnetometer Survey, Sub-bottom
Profiler Survey, Side Scan Sonar; Client/Owner: New JEC - Japan &
BATAN; 1995.
-
Pertamina
EXOR - 1 Project - Balongan - West Java; Bathymetric Survey,
Current Measurement, Sediment Transport Study, Wave Analysis, Dispersion
Characteristic Study, Sonic Prospecting / Sub Bottom Profiling, Water
Outfall Modeling;
Client/Owner: Pertamina & Japan Gas Cooperation Ltd.; 1991/1992.
|
|
| |
Please Click Images
below for enlarged sized
|
| |
 |
| |
Work in
progress during Topographic Survey (using Total Station) - Bali
Turtle Island Development - Bali
|
| |
 |
| |
Work in progress
during Control Survey Establisment (using GPS Receiver Trimble
4000Sci) - Bali Turtle Island Development - Bali
|
| |
 |
| |
Work in progress
during Effluent Discharge Impact Plumes Study, MAXUS SES. Inc -
Sunda Strait - West Java
|
| |
 |
| |
Upright position of
Waverider Bouy during the transport for Baron Wave Power Poject (inzet:
Waverider Bouy in it position)
|
| |
|
| |
|
| |
|
| |
|
|