Agung Feryono

Electrical Engineer

Agung Feryono has dedicated 14 years working as Electrical Engineer in PT Wiratman, durung these years, he has been involved in a lot of large and many projects in Power Engineering division, now he is a Division Head of Power Engineering.

As Electrical Engineer, some of his experiences was Consultacy Services for Site Characterisation Study of 250 MW Riau Island – Scattered Gas Engine Power Plant (GEPP) conducting a study of the power demand forecast and conducting a survey of market power, consultancy services for Feasibility Study in Sion Minihydro Power Plant (MHPP), and as Transmission Line Engineer was conducting a Pre-Feasibilty Study and Site Selection Study and recommend the proposed site along with deliverables including customer load profile in KIM industrial estate Medan for 2x150 MW + 300 MW (optional) Coal Fired Power Plant project, and responsible  for all works related to design of substation at power plant and 150 kV transmission line between new power plant to existing PLN’s substation and transmission line.

As Head of Power Engineering Division, he has organized, control the team, managed all field operation of the services in administration aspects, control all field performance of the services in engineering aspect, advise on the most suitable and effective program for smooth and successful execution of the services and prepare the consultant team for all services to the owner. He has assisted Director to enhance business performances of power engineering division in terms of marketing, finance, and human resources.

He received his bachelor of Electrical Engineering in National Institute of Technology (ISTN).He is a certified Engineer (Ahli Teknik Transmisi Tenaga Listrik – Madya).