Marhatmadi Purwanto

Electrical Engineer

Marhatmadi Purwanto has worked as Electrical Engineer in Wiratman. During his work at Wiratman, he has been involved in a lot of projects in Power Engineering division.

As Electrical Engineer, he was responsible to design Electrical & Instrumentation of Power Plant System, he also assisted owner to supervise commissioning process and reporting.

Some of his experiences was Consultancy Services for Revision of Feasibility Study Report of Sapaya Mini Hydro Power Plant (MHPP) as Transmission Line Engineer, Consultancy Services for Pre-Feasibility Study & Site Selection of 2x150MW + 300MW CFPP for KIM Medan to collect related data to provide load profile of the KIM’s customer, riview the bid document and conducting Technical Evaluation of Bids in Tender of Kirana Berau 2x20 MW CFPP Project, and he also as a team leader to prepared riview design, implementation schedule, monthly report, and construction report for Pre-Feasibility Study of 150 Kv Transmission Line Sorowako – Bahodopi, Sulawesi.

He received his bachelor of Electrical Engineering in Institute of Technology Bandung (ITB). He is a Certified Engineer (SKA Madya).