Awal Juni Siregar

Electrical Engineer

Awal Juni Siregar has dedicated 11 years working as Senior Electrical Engineer in Wiratman. He has finished several projects in Wiratman for Power Engineering Division.

With more than 22 years of work experience in the Electrical Engineering and site supervision, such as construction installation, testing and commissioning, quality control / assurance (QA/QC), preparation of feasibility study, criteria design, basic design, detail design, bid document, evaluation of contractor bid, preparation of contract document, reviewing detailed design, design implementation, close coordination with the owner, bid conference and site visit, in rural electrification project, industrial plants project, diesel power generation plants project, combine cycle power plant project, coal fired steam power plant project, hydroelectric power plant project, and mini hydroelectric power plant project.

Some of his experiences was consulting service for Site Characterization Study of 180 MW Riau Islands – Scattered Gas Engine Power Plant (GEPP) as Electrical Engineer (Power System Engineer), Power Generation and Distribution System Engineer for Consultancy Service for Feasibility Study of Lawang Agung Minihydro Power Plant (MHPP) and FEED Rangkiang, West Sumatera MHPP, Electrical Engineer for Consultancy Service for Transmission Lines Study in Wind Power Plant (PLTB) Hambapraing and he was also the team leader in Consultancy Services for Review Design and Construction Supervision for Lodagung MHPP.

He was graduated from University of North Sumatera (USU) Medan. He is a Certified Engineer (SKA Madya).