Dili Main Road

Location

Timor Leste

Client

Government of The Democratic Republic of Timor-Leste



This is an assignment from The Democratic Republic of Timor-Leste to perform the Detailed Engineering Design and Bid Document Preparation for the Dili Main Roads Reconstruction Project in Dili, Timor-Leste. The aim of this project is to increase the life time of the road through standard quality control of road alignment and pavement, provision of subsurface and drainage system, to improve the safety for all road users, including pedestrians and non-vehicular transport, and to provide traffic capacity that meets the 10 years traffic projection horizon. Besides, this project is also intended to improve all of the existing roads in the city of Dili to become urban road with international standard.

The project covered almost all of the city’s road segments and consists of three road function - arterial, collector and local roads - with a total length of 47.037 km and 33 road segments with the main focus on the city center, where government offices, embassies, business district are located. 

Until the end of 2013, the construction of almost all of the city center’s roads has been completed.