Faried Satria Sumirat

Civil Engineer

Faried Satria Sumirat has worked as Civil Engineer at Wiratman, he has involved in a lot of large projects in Power Engineering Division.

As a Civil Engineer, he has conducted some projects of study and design, including site selection, pre-Feasibility Study, Feasibility Study, Detailed Design and Supervision related to Civil Works.

Some of his experiences as a team leader was responsible and coordinating the works of design of Architect, Structure, and Geotechnic in (2 x 660 MW) Rembang Coal Fired Power Plant (CFPP), Feasibility study and Detailed Design of (3 x 1,05 MW) Cilaki 1A/(3 x 3,23 MW) Cilaki 1B and Cimaragong (3 x 1,5 MW) Mini Hydro Power Plant (MHPP).

He also has involved as Civil Supervisior Engineer in Project Management Consultant (PMC) of 1 x 60 MW Kamojang Geothermal Power Plant, and as Civil Engineer in Telkomsigma Diesel Power Plant, Front Engineering Design (1 x 55 MW) Patuha Geothermal Power Plant, Consultancy Service of Sumatera Barat (2 x 110 MW) CFPP, and Cilegon Combined Cycle Power Plant.

He received his bachelor of Civil Engineering in Institute of Technology Bandung (ITB). He is a certified Engineer (Ahli Teknik Bangunan Gedung – Madya).