Sam Ratulangi International Airport

Location

Manado, North Sulawesi

Client

Ministry of Transportation Republic of Indonesia, Directorate General of Civil Aviation

 

Wiratman had join cooperation with NACO (Netherland Airport Consultants B.V.) The Netherlands to be involved in the 3 phase development Master Plan of Sam Ratulangi International Airport for the area of 2.650 meters long runway; Phase I – 2008, Phase II – 2018 and Phase Ultimate. To conduct the detail engineering design in several scope of works include flood control, the extension of runway and taxiway, existing runway pavement overlay, new apron, new terminal building with one passenger boarding bridge, air traffic control tower, operation building, aid and fire extinguisher station, warehouse, S.A.R building, utilities buildings, navigation and communication tools, etc.